1844 Flint Barn Accommodation
02392 631446

SEPTEMBER 2011
- 10th Sep 2011

We are pleased to announce that self catering accommodation will soon be available at The Stables, Pitlands Barns. The interior is finished  and once the paths and patio are laid and car parking area concreted we will be open for business!  New photos on www.pitlandsbarns.co.uk.

The Cart Shed at Pitlands Barns is nearly complete, just waiting for the finishing touches to the bathrooms and the arrival of the furniture and curtains.

The Granary at Pitlands Barns is still waiting for stairs, but all the oak floors are laid upstairs and the kitchen in the process of being fitted. Bathrooms all ready to be installed next week. The barns look splendid now the scaffolding is down.

We are still hoping to be fully opened by the end of October, 2 months ahead of schedule. On-line booking is now available at www.pitlandsbarns.co.uk.

MAY 2011
- 15th May 2011

The solar panels are now on the roof on the south side. The walls in the Stables have been plastered and have had the first coat of paint– it is almost looking habitable. We just need some stairs!

We are well ahead of schedule and hope to be open by December.

APRIL 2011
- 18th Apr 2011

The topping out ceremony on the roof – 21st April – the last ridge tile was laid by Andrew.

Under floor central heating has been installed in the Stables and the Cart Shed. The oak windows are all fitted now making the barns watertight!

MARCH 2011
- 20th Mar 2011

The roofers have been working hard for more than a month, insulating and tiling the roof – 10,000 slates!

Work goes on making openings for the windows and doors on the south side of the barns.  Inside the barns, the internal walls are taking shape.

JANUARY 2011
- 09th Jan 2011

The enormous rainwater tank has been lowered into the 6 metre deep hole and pipes laid to collect all the rainwater from the roof. Sewage pipes have also been connected to the sewage treatment plant. The roof has been removed and all the rafters checked and damaged ones replaced.